Pep Boys – San Marcos, CA 2022-05-16T18:55:41+00:00

Project Description

TILE RESET

  • Removed tile and set aside, approx. 2,300 square foot complete (two-piece) tile section over Building 3.
  • Thoroughly inspected and replaced wood roof membranes as needed.
  • Furnished and installed two layers of 30 lbs. underlayment and secured with mechanical fasteners.
  • Replaced edge metal, valley metal and flashings as needed.
  • Reinstalled and secured tiles over repair area.
  • Replaced broken tiles over repair area as needed. New tiles matched to existing as close as possible.
  • Set mortar to match style.
  • Removed and hauled away debris caused by roofing.

Project Details

Skills Needed:

Categories: